DP Telecom - Validation de la configuration multipath – Maintenance details

All systems operational

Validation de la configuration multipath

Completed
Scheduled for October 11, 2025 at 3:00 AM – 6:00 AM

Affects

SIP Trunking - Signaling Regions

Under maintenance from 3:00 AM to 6:00 AM

THAT

Under maintenance from 3:00 AM to 6:00 AM

SIP Trunking - Media Anchor Sites

Under maintenance from 3:00 AM to 6:00 AM

CA

Under maintenance from 3:00 AM to 6:00 AM

Updates
  • Completed
    October 11, 2025 at 6:00 AM
    Completed
    October 11, 2025 at 6:00 AM
    Maintenance is now in progress
  • In progress
    October 11, 2025 at 3:00 AM
    In progress
    October 11, 2025 at 3:00 AM
    Maintenance is now in progress
  • Planned
    October 11, 2025 at 3:00 AM
    Planned
    October 11, 2025 at 3:00 AM

    Nous souhaitons vous informer qu'une maintenance planifiée sera effectuée à notre centre de données secondaire. Cette intervention consiste à restaurer la redondance d'un contrôleur de stockage et à valider la configuration multipath afin d'assurer un fonctionnement optimal.

    ·         Centre de données secondaire
    Restauration de la redondance d'un contrôleur de stockage et validation de la configuration multipath


    Détails de la maintenance

    Date et heure de la maintenance : Vendredi 10 octobre 2025 à 23 h 00 (HE)

    Fenêtre de maintenance : 3 heures

    Impact sur le service : Risque d'impact moyen 

    Durée de l'impact sur le service : De courtes interruptions peuvent survenir pendant l'opération.

    Services touchés : Les services VPS et voix pourraient subir de brèves perturbations en cas de temporisations d'E/S.

    Remarque : Les clients correctement configurés avec la fonction de basculement ou de géo-redondance ne devraient pas subir d'interruptions du service vocal.